Security Cameras / Interactive field guide
Commercial Security Camera Installation Checklist
Build a commercial camera project brief with an interactive checklist for coverage, UniFi, Verkada, Axis, Hanwha and Avigilon systems, recording, and handover.

What you’ll leave with
A camera installation brief with coverage priorities, recording requirements, and open survey questions.
- Define what each camera needs to show before choosing a model.
- Scope recording, network capacity, licenses, and mounting alongside the cameras.
- Accept the installation by testing views, exports, permissions, and handover records.
A useful camera installation starts with the questions your team needs footage to answer. Who entered a restricted area? What happened at the loading dock? Was a package left at the reception desk? Those questions determine placement, lighting, recording, and access requirements before anyone chooses a camera model.
Use this checklist to prepare a commercial project at one building or across multiple locations. It separates decisions you can make before a survey from details that need to be checked on site. A clear scope also makes competing proposals easier to compare: the same camera count can represent very different coverage and installation work.
Put this guide to work
Build your camera site-survey checklist
Mark only items you have actually documented. The result separates ready inputs from the next actions to take to your survey.
Mark priority scenes and the required evidence on a plan; separate overview from identifying detail.
Review entrances, glare, after-hours lighting, moving vehicles, and shelving under normal site conditions.
Set a recording schedule, retention target, and storage design assumptions for each relevant camera group.
Survey cable paths and verify the network/power requirements and responsible team.
Identify mounts, lifts, ceiling access, weatherproofing, work windows, and restoration where needed.
Name the business account owner, set user roles, and document onboarding and access removal.
Ask for a bill of materials plus cabling, labor, licensing, support, and change-approval terms.
Specify view checks, search/export tests, permissions, labeling, account handover, training, and support contacts.
0 of 8 items reviewed
0 documented. 8 need review or work.
Keep your project brief
Complete choices above to create a brief. You can copy the guide link now.
Entries stay in this page’s memory. They are not saved to an account or sent in a quote request. Reset or reload clears the tool; downloaded or copied text remains wherever you keep it.
1. Define the job of each camera
Mark the areas of interest on a floor plan or annotated photographs. For each view, describe the required result rather than simply requesting a wide view. An overview of a parking lot and a clear view of someone at an entrance are separate tasks. Ask the proposed installer to show how the selected lens, mounting position, and lighting support each task.
Review the scene during normal operations. Open doors, parked trucks, shelving, glare, and changing daylight can obstruct a view that looked good in an empty building. Decide which areas should be excluded and who in your organization approves camera placement and any audio recording.
- List entrances, reception, loading areas, stock rooms, and outdoor zones with an owner for each requirement.
- Identify after-hours lighting, moving obstructions, weather exposure, and places where mounting requires special access.
- Separate must-have evidence views from helpful overview views before setting the equipment budget.
2. Compare platforms against your operating needs
UniFi Protect, Verkada, Axis, Hanwha Vision, and Avigilon offer different camera and management options. Start with how staff will find footage, manage permissions, and maintain the system. Request a demonstration of those tasks using the proposed configuration. A familiar brand name alone does not establish that a particular camera, recorder, and software combination meets the scope.
| Platform | Planning consideration | Ask in the proposal |
|---|---|---|
| Ubiquiti UniFi Protect | Recording on a compatible UniFi host; supported Teleport designs can record across sites. | Where will recordings reside, and which camera features and network paths are required? |
| Verkada | Cloud-managed video with onboard storage and licensing requirements. | What hardware, license term, retention, and renewal costs are included? |
| Axis Communications | IP cameras, recorders, intercoms, and video management options. | Which management software and device licenses fit the project? |
| Hanwha Vision | Camera and recorder choices, including Wisenet WAVE video management. | Which cameras, recording platform, and analytics are in the actual design? |
| Avigilon Alta and Unity | Alta provides cloud-native video management; Unity provides an on-premises video platform. | Which platform, cameras, storage, and licenses support the required workflow? |
3. Survey cabling, power, and network readiness
Give the installer access to network closets and the proposed cable routes. The scope should identify new cable runs, usable existing cabling, mounting hardware, switch ports, and the power needed by each selected device. Power over Ethernet requirements vary, so both the port capability and the switch's total power budget need checking.
Discuss network separation, remote administration, updates, and backup power with your IT team. For a distant building or outdoor area, establish the path back to the network and power availability before assuming a camera can be added there. Fiber may form part of that connection, but the camera still needs a suitable power source.
- Record who owns the switches, network configuration, internet connection, and credentials.
- Include lifts, ceiling access, cable pathways, penetrations, weatherproofing, and restoration where applicable.
- Identify work-hour restrictions and areas that cannot be taken offline during business operations.
4. Agree on recording, retention, and user access
Specify whether each camera records continuously, on events, or on a schedule. Set the required retention period and ask how the proposed storage calculation accounts for image settings, activity, and the number of cameras. An available disk size or advertised retention option is not a substitute for a documented design.
Decide who can watch live video, search recordings, export clips, change settings, and invite users. Include an employee departure process and a named business owner for administrator accounts. Ask what continues working during an internet interruption, how staff access recordings afterward, and what happens if a recorder or storage device fails.
5. Compare the complete installed scope
Require separate line items for equipment, cabling, mounting, configuration, licenses, training, and recurring services. Clarify whether ongoing monitoring, maintenance, and remote support are included or quoted separately. Ask how additional cable length, concealed conditions, or a revised camera position will be approved before extra work proceeds.
For multiple locations, use a common scope template but retain a site-specific equipment list and survey. Different ceiling heights, internet connections, lighting, and access hours can change labor and hardware requirements. A pilot location can reveal usability or installation issues before the same design is repeated elsewhere.
6. Test the result and collect the handover
Acceptance should involve the people who will use the system. Walk through a real example: locate an event, review the right cameras, export a clip, and confirm that an ordinary user cannot change administrator settings. Resolve any missed coverage or confusing camera names before closing out the installation.
- Check agreed views during daylight and after hours, including entrances with difficult lighting.
- Verify camera names, time settings, recording schedules, permissions, and the agreed retention configuration.
- Receive a camera plan, equipment inventory, cable labels, account ownership details, and license records.
- Record support contacts, warranty terms, training completion, and any remaining work with responsible parties.
Common questions
How many cameras does my business need?
Start with required views, not square footage alone. An entrance identification view and a parking-lot overview may need different positions or lenses. A site survey checks sightlines, lighting, obstructions, and overlap before setting the count.
Can we reuse our existing cameras?
Possibly. Record the exact model, firmware, cabling, and current recorder. Confirm the features supported by the proposed management platform; basic video compatibility does not guarantee analytics, audio, or every camera setting will work.
What should be included in the installation quote?
Request equipment models, quantities, installation work, cable paths, network responsibilities, recording assumptions, license terms, acceptance tests, and handover deliverables. List exclusions and recurring charges separately so proposals can be compared.
Sources & accuracy notes
Source information reviewed . Confirm compatibility, availability, and commercial terms for the proposed equipment. Planning tools organize your assumptions; the site survey and agreed design establish the final scope.
- Ubiquiti: introduction to UniFi
- Ubiquiti: Protect Teleport Adoption
- Verkada: video security
- Axis: product portfolio
- Hanwha Vision: Wisenet WAVE
- Avigilon: Alta cloud security
- Avigilon: Unity on-premises security
Have a correction or a project question? Contact BlueHouse Telecom.
